1 Introduction ___________________________________________________________5
x
马上注册,结交更多热工坛友,更多精彩内容等着您!您需要 登录 才可以下载或查看,没有帐号?免费注册 
  1.1 Preface _________________________________________________________________ 5
 1.2 Evolution of the ITER Design ______________________________________________ 8
 1.3 Guidelines and Objectives ________________________________________________ 10
 1.4 Modeling of Design Alternatives ___________________________________________ 10
 1.5 Convergence to an Outline Design__________________________________________ 11
 1.6 Conclusion _____________________________________________________________ 12
 2 Design Overview_______________________________________________________13
 2.1 Design_________________________________________________________________ 13
 2.2 Operation Scenarios and Phases ___________________________________________ 21
 3 Plasma Performance ___________________________________________________24
 3.1 ITER Plasma Current and Size ____________________________________________ 24
 3.2 Plasma Confinement Extrapolation_________________________________________ 25
 3.3 H-mode Pedestal and ELMs_______________________________________________ 26
 3.4 Internal Confinement Barrier _____________________________________________ 26
 3.5 Non-axisymmetric Perturbations, Islands, and β limits _________________________ 26
 3.6 Divertor and Power Exhaust ______________________________________________ 27
 3.7 Plasma performance _____________________________________________________ 28
 4 Functional Role of Systems ______________________________________________31
 4.1 Magnets _______________________________________________________________ 31
 4.1.1 Toroidal Field Coils ___________________________________________________________ 31
 4.1.2 Poloidal Field Coils ___________________________________________________________ 33
 4.1.3 Error Field Correction Coils _____________________________________________________ 34
 4.1.4 Superconducting Coil Protection _________________________________________________ 34
 4.1.5 Superconducting Coil Cryogenic Cooling___________________________________________ 35
 4.2 Vessel and In-vessel Systems ______________________________________________ 35
 4.2.1 Neutron Shielding_____________________________________________________________ 35
 4.2.2 Blanket Modules______________________________________________________________ 36
 4.2.3 Blanket maintenance___________________________________________________________ 37
 4.2.4 Divertor ____________________________________________________________________ 37
 4.2.5 In-vessel Component Water Cooling ______________________________________________ 38
 4.2.6 Cryogenic Pumps _____________________________________________________________ 38
 4.2.7 Vacuum Vessel_______________________________________________________________ 39
 4.2.8 Vacuum Vessel Pressure Suppression System _______________________________________ 39
 4.3 Mechanical Loads and Machine Supports/Attachments ________________________ 39
 4.3.1 Seismic Loads________________________________________________________________ 40
 4.3.2 Electromagnetic loads__________________________________________________________ 41
 4.4 Fuel Cycle _____________________________________________________________ 41
 4.5 Tokamak Building_______________________________________________________ 43
 4.6 ITER Plant Operation and Control _________________________________________ 44
 5 R&D Overview ________________________________________________________48
 5.1 Introduction____________________________________________________________ 48
 5.2 CS  Model Coil and TF Model Coil _________________________________________ 49
 5.3 Vacuum Vessel Sector____________________________________________________ 51
 5.4 Blanket Module _________________________________________________________ 51
 5.5 Divertor Cassette________________________________________________________ 51
 5.6 Blanket and Divertor Remote Handling Systems ______________________________ 52
 5.7 Other R&D ____________________________________________________________ 54
 6 Safety and Environmental Assessment _____________________________________56
 6.1 Objectives and Approach _________________________________________________ 56
 6.2 Environmental Impact ___________________________________________________ 56
 6.3 Waste and Decommissioning ______________________________________________ 57
 6.4 Worker Safety __________________________________________________________ 57
 6.5 Safety Analysis _________________________________________________________ 58
 6.6 No evacuation objective __________________________________________________ 61
 6.7 Safety assessment conclusions _____________________________________________ 61
 7 Quality Assurance Program______________________________________________62
 8 Construction, Commissioning and Decommissioning Plans ____________________63
 8.1 Introduction____________________________________________________________ 63
 8.2 Overall and Summary Schedule____________________________________________ 63
 8.3 Construction and Procurements ___________________________________________ 64
 8.3.1 Procurement Assumptions ______________________________________________________ 64
 8.3.2 Buildings and License to Construct _______________________________________________ 65
 8.3.3 Procurement of Long Lead-Time Items ____________________________________________ 65
 8.4 Tokamak Assembly______________________________________________________ 66
 8.5 Commissioning Plan _____________________________________________________ 66
 8.5.1 Individual Sub-System Test _____________________________________________________ 66
 8.5.2 Integrated Commissioning up to the First Plasma Discharge ____________________________ 67
 8.5.3 Commissioning after First Plasma ________________________________________________ 67
 8.6 Decommissioning Plan ___________________________________________________ 67
 9 Cost Estimates_________________________________________________________69
 9.1 Resources Required for ITER Construction__________________________________ 69
 9.1.1 Cost Estimating Approach for ITER Construction ____________________________________ 69
 9.1.2 Basic Data — Procurement Packages for Cost Estimation ______________________________ 69
 9.1.3 Evaluation of Cost Estimates ____________________________________________________ 70
 9.1.4 Cost Estimates Summary _______________________________________________________ 71
 9.2 Cash flow for the direct capital cost_________________________________________ 72
 9.3 Construction Management and Engineering Support __________________________ 74
 9.3.1 Assumptions _________________________________________________________________ 74
 9.3.2 Estimated Personnel Cost During Construction ______________________________________ 74
 9.3.3 Possible R&D Cost During Construction ___________________________________________ 75
 9.4 Resources for ITER Operation ____________________________________________ 76
 9.4.1 Project Manpower Costs________________________________________________________ 76
 9.4.2 Energy Costs_________________________________________________________________ 76
 9.4.3 Fuel Costs___________________________________________________________________ 77
 9.4.4 Capital Improvement, Spare Parts, Maintenance Costs_________________________________ 77
 9.4.5 Conclusion:  Average Annual Operation Costs_______________________________________ 78
 9.5 Decommissioning Costs __________________________________________________ 78
 9.6 Summary ______________________________________________________________ 79
 10 Conclusions_________________________________________________________80
 
 [ 本帖最后由 qinsdau 于 2009-1-12 14:19 编辑 ]
 | 
 |